World Sports has worked on 8 FIFA tournaments since 2014, 5 editions of the Copa America since 1997 and Olympic football at Rio 2016.






The work we delivered for the 2026 FIFA World Cup, stadium by stadium and field by field.
Pitch construction at five stadiums, delivered by the World Sports Group team.
World Sports Group

We built the pitches at 4 of the 12 stadiums and worked on 4 more. One of them was Neo Quimica Arena, where the tournament opened, with the first underground field-cooling system in Latin America.
Copa America: field consulting and maintenance in Bolivia (1997), Paraguay (1999) and Colombia (2001); tournament fields in Brazil (2019) and at host stadiums in the United States (2024).









8 FIFA tournaments since 2014, including the FIFA World Cups of 2014 in Brazil, 2022 in Qatar (delivered by the World Sports Group team) and 2026 in Mexico and the United States, plus FIFA youth and women's tournaments in Brazil, Costa Rica, the Dominican Republic, Colombia and Chile. We are preparing for the 2027 FIFA Women's World Cup in Brazil.
In Guadalajara, pitch operations and maintenance at Estadio Akron and the Verde Valle training center, where we built three new training fields for Chivas. In Mexico City, field support at Estadio Azteca. In Tijuana, training-site support at the Club Tijuana facility. In the United States, a hybrid stitching system for Levi's Stadium and Dennis Mowers for host-venue grounds teams.
We built the pitches at 4 of the 12 stadiums and worked on 4 more. One of them was Neo Quimica Arena, where the tournament opened, with the first underground field-cooling system in Latin America.
Yes. 5 Copa America editions since 1997: field consulting and maintenance in Bolivia, Paraguay and Colombia, and tournament fields in Brazil in 2019 and at host stadiums in the United States in 2024. We also worked on Olympic football at Rio 2016, at Neo Quimica Arena.
Tournament fields are built to fixed dates and tested before every match. The same crews, equipment and test methods work on every World Sports project, big or small.
Tournament fields are built to fixed dates and tested before every match. The same crews, equipment and test methods work on every World Sports project.
Talk to our experts →