Soccer wears a field in a few places and leaves the rest alone. This page shows what we measure, what we do across the year, and which machines fit, for community fields, complexes and stadium pitches.
Keepers, set pieces and kickoffs concentrate the damage in the same few spots.
Matches, training and tournaments leave little time for the pitch to recover.
Roofs and stands block sun and air, so parts of the pitch grow weaker.
Broadcasts, players and fans notice every bare spot and every bad bounce.
The wear is concentrated: goal mouths, the penalty areas, the center circle and the strip where the assistant referees run. The field can look fine from the stands while the goal mouths are bare.
Soccer is played in every month in Florida, so there is no long off-season; renovation has to fit between leagues, and the October overseed decides how the field looks from December to March.
A true surface matters more than in most sports: ball roll and bounce depend on an even, dense canopy and a level grade, so levelness and density are measured, not only hardness.
| What we measure | How | What good looks like |
|---|---|---|
| Surface hardness | Clegg impact tester, 2.25 kg hammer, on a fixed grid of at least ten points per field, two in each goal mouth | Every point between 40 and 100, FIFA's safety limits (under 40 too soft, over 100 too hard); 70 to 85 is FIFA's excellent range. Readings that rise between visits are the early warning for compaction |
| Compaction in the rootzone | Penetrometer to 12 to 15 inches at the same grid, at comparable moisture each visit | Most readings under 300 psi; roots slow above 100 and stop near 300. Deep tining when half the readings exceed 300 |
| Rootzone moisture, salinity, temperature | POGO handheld at the grid; Soil Scout buried sensors where fitted | Inside the band set for your rootzone from the soil test (sand fields run drier than native soil); irrigation triggered at about half the plant-available water used |
| How fast water goes in | Infiltrometer at three points including one goal mouth | About 1 inch per hour or better; under a quarter inch per hour means compaction or layering |
| Turf cover, density and thatch | Visual grid count; thatch depth on a core | Never under 75 percent anywhere (FIFA's limit); over 90 percent in the goal mouths before the season; thatch under three quarters of an inch on bermuda |
| Levelness and grade | 10-foot straightedge in the penalty areas; laser on the full field when the assessment calls for it | No hollows deeper than half an inch under the straightedge (FIFA's safety limit is 1.2 inches); slope still as built |
| Soil chemistry and texture | Lab sample once a year, physical and chemical | pH 6.0 to 7.5; nutrients to the lab's sports-turf targets; topdressing sand matched to the rootzone |
Hardness per ASTM F1702 with a 2.25 kg Clegg, the method in FIFA's natural-pitch test protocol; device and standard named in every report. Safety limits are FIFA's natural-pitch rating bands, the same on every field.
Goal mouths and the six-yard box. Penalty spots and the center circle. The assistant referee strip along each touchline. Fields where the goals never move.
| Season | What the field needs | Service |
|---|---|---|
| January to April | Hardness and compaction checks as league play compacts the surface; decompaction passes without downtime; goal-mouth re-sod before spring leagues; fertility and weed control on plan | Decompaction · Field Program: Monitor · Field Program: Service |
| May to August | The annual reset while bermuda grows fastest: aeration, verticut with collection, topdressing; fraze and laser grading on the worst fields; sand-cap applications on native-soil fields; construction and large renovation window | Summer renovation · Fraze renovation and laser grading · Soil & Fertility Program · Large-scale renovation · New field construction |
| September | Pre-season check and sign-off before tournament season; line marking plan | Event and tournament preparation · Field Program: Monitor |
| October | Winter overseed with perennial rye after a verticut, when days are 80 to 85 °F and nights near 55 | Winter overseeding |
| November to February | Drainage correction while fields are quieter; the best months for a field assessment and for next year's plan | Drainage correction · Field assessment |
Stadium, training center and complex pitches built from the subgrade up.
See more →Goalmouth repair, fraze mowing, laser grading and full pitch replacement between seasons.
See more →Your whole field program under one contract, for complexes and leagues.
See more →Slit drainage for pitches that hold water, so they reopen sooner.
See more →



World Sports is an authorized US dealer for Dennis and SISIS.
San Bernardino, California17 fields, turnkey field management since 2016.
Guadalajara, MexicoEstadio Akron and the Verde Valle training center, pitch operations for FIFA World Cup 26.
Sao Paulo, BrazilBuilt for the 2014 World Cup; hosted the opener and Olympic football.
FloridaTwo consecutive competitively bid contracts, 160+ fields.
MexicoPitch work at Mexican World Cup stadiums and training centers, including Estadio Banorte and Chivas at Estadio Akron and Verde Valle.
BrazilWe built the pitches at 4 of the 12 stadiums of the 2014 World Cup in Brazil and worked on 4 more.














A pitch where the ball rolls and bounces consistently and the footing is the same from one goal to the other. That comes from an even surface, dense turf cut low, a rootzone that drains and the right moisture.
Goalmouths take the most traffic, so they need a repair plan: overseeding, sod reserves, aeration and moving practice drills away from them. In stadiums we replace them between seasons when needed.
We measure surface hardness, compaction, moisture, infiltration, turf cover and levelness on a fixed grid across the pitch, and read the results against FIFA's natural-pitch safety limits, the same on every field. Ball roll, ball bounce and traction need the full FIFA test protocol, run by an accredited test institute.
Goalmouth and high-wear repairs can be done in days. A fraze mow and regrow, or a full rebuild, needs weeks of active growing weather. We plan around your calendar.
Yes. Drainage, aeration and off-season renovation help fields reopen sooner after rain and hold up through tournament weekends. At San Bernardino we manage 17 fields under one contract.
Yes. For FIFA World Cup 26 we ran pitch operations at Estadio Akron and the Verde Valle training center for Chivas Guadalajara. Every tournament we have worked on is on our FIFA & International Tournaments page.
Tell us how many fields you have and when the leagues play. We will walk them and tell you what each one needs.
Talk to our experts →